Patrocinado

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
8K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Pesquisar
Categorias
Leia Mais
Outro
風景
關子嶺美麗的景色
Por Lin5 88589 2023-07-20 12:29:58 4 7K
Outro
What can you do at Pitogo.app?
Besides creating posts on your profile, you can do the following: Create A Story Share material...
Por PiToGo✈ 2022-09-26 06:44:11 105 20K
Outro
办公室植物宠物
同事办公室里的多肉植物养得很好!
Por Yh Lin 2023-07-19 00:10:54 2 7K
Fitness
International delegation at the "Sovelmash" construction sit
From September 12 to September 15, prior to the SOLARGROUP International Conference 2023, the...
Por Konan Firmin Kouakou 2023-10-05 18:00:11 4 7K
Outro
넓은 바다
수평선
Por Hyuntae Park 2023-07-18 03:36:17 4 6K