Προωθημένο

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
10χλμ.

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Αναζήτηση
Κατηγορίες
Διαβάζω περισσότερα
Literature
努力提升自己
超赞的一句话:“好的生活状态,不是仰望别人,而是把自己活成一道风景。”记住一个道理:只要自己变优秀了,其他的事情才会跟着好起来;无论何时,与其仰视,羡慕他人,不如花时间充...
από Liu Jingdong 2023-07-10 10:33:22 2 8χλμ.
Art
솥&장독대
옛생각..
από Ljino K1004 2023-07-12 00:16:34 5 7χλμ.
άλλο
美丽中国乡村
绿水青山就是金山银山!
από Yh Lin 2023-09-12 02:14:28 0 8χλμ.
Gardening
Grapes On the tree Nho trên cây
Grapes On the tree                     ...
από hiepyahu Ngo 2023-06-05 06:33:17 5 10χλμ.
άλλο
여행
시원한 여름
από Hyuntae Park 2023-08-04 09:10:13 2 7χλμ.