Προωθημένο

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
10χλμ.

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Αναζήτηση
Κατηγορίες
Διαβάζω περισσότερα
άλλο
一抹亮色
亮色,生活需要亮色,哪怕只是一抹!
από Yh Lin 2023-11-08 02:11:36 2 8χλμ.
Gardening
장미
από Hyuntae Park 2023-07-11 23:32:30 8 9χλμ.
Κεντρική Σελίδα
Elon Musk đang muốn nói điều gì ?
Hệ sinh thái X của Elon Musk sắp sửa kết hợp với Pi Network để tạo ra đồng tiền mã...
από Thang Nguyen Quang 2023-08-04 08:21:33 2 12χλμ.
άλλο
Khổ qua
Khổ qua
από Kim Phan 2023-08-13 12:13:21 3 8χλμ.
Κεντρική Σελίδα
Crypto News
Price of Dogecoin, Twitter, Elon Musk and the need for regulation  A few days ago, everyone...
από Qalab A1985 2023-04-16 11:35:53 2 10χλμ.