​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Cerca
Categorie
Leggi tutto
Altre informazioni
시원한 풍경
By Ljino K1004 2023-07-15 01:52:53 6 6K
Art
映射前的准备
🇨🇳 【映射前的步骤】     1、第1-4项一定要已经完成(为绿色)     2、等系统通知第5项任务(KYC)     ...
By Fjj Lwzh 2023-03-17 08:08:42 2 8K
Health
Singing bowl level 2 class with Master Hoang Tuyet Mai
I have spent 3 days learning Himalaya singing bowl therapy level 2 with Master Hoang Tuyet Mai....
By LINH VUONG 2023-07-08 14:15:45 3 8K
Networking
kyc
新华区收到,通过kyc的越来越多了!恭喜大家!发发发…
By Juliang Chen 2023-05-18 02:17:13 6 9K
Fitness
TAY NINH Province
Ba Đen Tây Ninh
By Minh Lau4 2023-11-22 04:02:37 6 7K