Commandité

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
10KB

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Rechercher
Catégories
Lire la suite
Domicile
Pi network
Những ngày sắp tới sẽ hào hứng
Par Anhkiet77 Huynh 2023-05-17 06:25:36 7 8KB
Autre
여행
공원에 산책
Par Hyuntae Park 2023-08-05 22:02:48 4 6KB
Gardening
평화
Par Hyuntae Park 2023-07-13 11:08:29 5 8KB
Causes
坚定信念坚守初心
相信相信的力量!
Par 凡 昝 2023-10-02 13:59:23 0 9KB
Art
*****PI BULL ON THE WAY*****
PiNetwork will be future of millions  people What do you guys think?
Par Pspanw Ar1234 2023-06-18 10:43:13 5 12KB