​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Rechercher
Catégories
Lire la suite
Autre
Uống chung nguồn nước
Uống chung nguồn nước
Par hiepyahu Ngo 2023-06-14 06:28:35 2 7KB
Autre
SUPORT NODE PI
JONGJIN CÀI ĐẶT PI NODE – PI NETWORK CHI TIẾT ĐẦY ĐỦ  I - KIỂM TRA ẢO...
Par JONGJ IN3979 2023-12-17 03:29:04 5 8KB
Gardening
일상
비온후 경치
Par Hyuntae Park 2023-07-11 14:19:59 5 7KB
Autre
Dream with SOLARGROUP!
​​If the SOLARGROUP brand were a person, it would be a Magician. Because we have the superpower...
Par Konan Firmin Kouakou 2023-10-24 18:10:27 0 8KB
Autre
여행
풍경
Par Hyuntae Park 2023-09-09 01:59:30 3 6KB