​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Buscar
Categorías
Read More
Other
中国民间传统娱乐
周宁县咸村镇下坂村民间桌戏皇帝和皇后的服装。
By Yh Lin 2023-08-18 22:30:45 3 7K
Other
Tình bạn
Tình bạn
By hiepyahu Ngo 2023-06-14 06:30:50 5 9K
Home
Pi network
Hướng đến tương lai.
By Anhkiet77 Huynh 2023-05-20 04:33:01 12 9K
Art
我家小姑娘
家有一只狗🐶名叫小姑娘!真是乖乖…
By Juliang Chen 2023-05-24 02:26:52 7 9K
Art
算力
发个帖 赋能pi
By Ycy 2211 2023-03-22 07:36:43 1 8K