Gesponsert

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
8KB

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Search
Nach Verein filtern
Read More
Causes
坚定信念为兀赋能
九月开启世纪元,兀链华夏创辉煌,先锋岂触等闲之,同建共赢划蓝图!
Von 凡 昝 2023-09-17 02:33:12 0 7KB
Home
Crypto News
Trader Targets $63,000 Bitcoin Price for New Bollinger Band “Breakout”  Bitcoin...
Von Qalab A1985 2023-05-15 03:39:56 3 8KB
Other
海天
靠海的天空很蔚蓝,海边高尔夫练习场蛮有意思!
Von Yh Lin 2023-04-10 06:24:01 3 7KB
Home
Sài Gòn xứ vội
SÀI GÒN XỨ VỘI ! Hồi mới vào Sài Gòn, thấy cư dân xứ vội...
Von Thang Nguyen Quang 2023-05-10 06:35:20 4 8KB
Causes
The Local Representative Program
Local Representative Program   As a prominent player within the Pi Network ecosystem, we are...
Von Pitogo 2023-08-22 08:03:33 96 32KB