​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
البحث
الأقسام
إقرأ المزيد
الرئيسية
Crypto News
Uncertainty erodes confidence in banks, is Bitcoin the way out?  The financial turmoil...
بواسطة Qalab A1985 2023-04-05 07:05:45 2 8كيلو بايت
الرئيسية
Cuộc hành trình chinh phục tương lai 👌
VÒNG TUẦN HOÀN CỦA VIỆC TỐT.   Một buổi chiều cách đây hơn 100...
بواسطة Qalab A1985 2023-04-01 02:14:17 4 9كيلو بايت
Sports
휴가
무더운 라운딩
بواسطة Hyuntae Park 2023-08-04 09:16:05 3 6كيلو بايت
Shopping
Pi Soaps
Received the two bath soaps I ordered for 0.0000087π. 😍♥️✅💯
بواسطة Arven De La Cruz 2023-10-09 12:09:05 1 10كيلو بايت
الرئيسية
COME TO DA NANG - VIET NAM
Beautiful city that will stay in you memory in your life.
بواسطة Robert Phan87 2023-07-04 00:29:24 1 9كيلو بايت