Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
8K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Zoeken
Categorieën
Read More
Networking
Pigeon
Pigeon - symbol of peace.  Pray for a World without War.
By Nhqu An65 2023-10-25 02:45:32 5 7K
Home
鱼露
认真理解内容
By 奶瓶 大侠 2023-05-21 06:49:16 6 6K
Other
Pi Network Việt Nam
GCV 314159$ in Việt Nam 
By Qalab A1985 2023-04-19 03:22:56 2 8K
Home
警示名言
远离歪嘴和尚念滴歪经 远离神棍神婆跳大仙    
By 奶瓶 大侠 2023-05-16 13:03:37 3 9K
Home
Nhật ký đi lớp.
Tròn 13 tháng mẹ cho em đi bộ đội. Nhà neo người, neo cả tiền thế nên...
By Ngọc Hân Trần 2023-08-23 05:45:05 4 7K