Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
9Кб

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Поиск
Категории
Больше
Другое
여행
풍경
От Hyuntae Park 2023-09-04 05:53:46 1 6Кб
Food
커피한잔
무더운 여름에 커피한잔
От Kyunchul Yang 2023-08-21 11:57:06 8 8Кб
Другое
台灣之美麗風景
覺得很美😍
От Lin5 88589 2023-06-26 10:09:48 3 8Кб
Другое
여행
풍경
От Hyuntae Park 2023-09-29 21:23:33 6 6Кб
Art
hãy cảm nhận cuộc sống 1 cách của riêng bạn dù nó là gian dối hay 1 sự thật đâu đớn
Người không học nhìn cuộc sống đầy màu sắc và muôn màu...
От Quốc Sỹ Nguyễn 2023-10-22 01:18:56 2 7Кб