إعلان مُمول

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
10كيلو بايت

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
البحث
الأقسام
إقرأ المزيد
أخرى
여행
풍경
بواسطة Hyuntae Park 2023-09-09 01:58:39 2 6كيلو بايت
أخرى
여행
바다 풍경
بواسطة Hyuntae Park 2023-07-29 20:51:55 5 7كيلو بايت
Art
명언
올것은 오고 갈것은 간다
بواسطة Ljino K1004 2023-07-28 22:36:22 4 8كيلو بايت
الرئيسية
Pi network
Tương lai tươi sáng của các Pi thủ 
بواسطة Anhkiet77 Huynh 2023-05-10 18:41:48 10 9كيلو بايت
Art
博山炉
文物
بواسطة 振通 瞿 2023-07-27 03:02:26 1 8كيلو بايت