​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Search
Categories
Read More
Other
海天
靠海的天空很蔚蓝,海边高尔夫练习场蛮有意思!
By Yh Lin 2023-04-10 06:24:01 3 9K
Party
Bali tour and travel
Check out this post on Fireside! Follow this link to learn more and join the conversation:...
By CHOIRUL ANWAR 2023-06-27 05:23:11 3 14K
Causes
WEB3!.
Chỉ sau 5 ngày thử hoạt động tích cực bằng cách viết bài, đăng ảnh,...
By Slt n15 2023-10-20 02:56:26 5 13K
Other
RESULTATS OF THE WEEK IN THE PROJECT "DUYUNOV'S Motors"
​​📌Results of the week in the project "Duyunov's motors"    Every day brings tangible...
By Konan Firmin Kouakou 2023-07-13 19:21:37 4 8K
Home
Tương tác hàng ngày
Đã 5 ngày duy trì bonus tương tác ở mức trên 1. Nhìn kết...
By Thien Tran 2023-11-11 23:36:48 4 9K