​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Search
Categories
Read More
Shopping
Products from Asia
I want products from China, Indonesia, Suth Corea an Pakistan...
By Ghislain Apollin Gnassounou 2023-12-28 19:50:21 0 10K
Other
办公室植物宠物
同事办公室里的多肉植物养得很好!
By Yh Lin 2023-07-19 00:10:54 2 8K
Other
派探探
友友们,你们的派探探能登录上去吗?最近这几天,我的派探探登录时一直转圈圈,总也登录不上去。😅
By Dx53 0680 2023-03-18 14:41:59 2 8K
Home
겨울이 성큼
어서  겨울이 끝나고 대문 을 활짝  열고 암호화폐 불장에 파이가  오픈넷 합시다
By Syt Hda 2023-11-11 07:04:00 1 9K
Gardening
Hoa đẹp
Hoa đẹp
By Kim Phan 2023-08-10 12:49:08 2 9K