Sponsor

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
10K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Căutare
Categorii
Citeste mai mult
Alte
여행
풍경
By Hyuntae Park 2023-08-17 10:14:38 3 7K
Home
Pi network
Cuối tuần vui vẻ nha các pi thủ.
By Anhkiet77 Huynh 2023-06-10 12:48:58 10 11K
Alte
여행
풍경
By Hyuntae Park 2023-09-29 21:19:43 1 6K
Home
Crypto News
Người thành công thường chọn riêng cho mình một con đường rất đặc...
By Qalab A1985 2023-05-01 02:37:44 7 8K
Home
稳住
刚刚俺媳妇姐姐滴二嫂滴亲家母过kyc七绿了。 也是去年提交卡一年多滴案例。 兄弟们稳住了!😂
By 奶瓶 大侠 2023-05-22 02:44:15 2 8K