​​📌"Sovelmash" D&E construction site today | Asphalt paving, installation of heating mains and other activities 

 

At the main entrance to the O&A, the ground level has grown considerably from what you may have seen in one of the latest videos. The geotextile was installed and backfilling with sand commenced. This area will be levelled and prepared for asphalt paving, and so will be the area at the rear of the building, near the ramp. 

 

Due to the fact that the level of the heating mains utilities turned out to be higher than expected, it was necessary to dismantle the concrete bedding and dig a bit deeper in order to bypass the utilities. As of today, these tasks have been completed. 

 

Watch the video https://youtu.be/GwBaA-k3exw

for an overview of the work performed at the construction site.

Participate in the project by registering through our link

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Love
Yay
6
Căutare
Categorii
Citeste mai mult
Causes
Chăm chỉ và làm đúng luật
Khi có 1 đồng tiền mới xuất hiện, bạn có rất nhiều cơ hội để sở hữu nó miễn...
By Slt n15 2023-10-15 03:39:58 9 13K
Home
Pi network
Buổi tối tốt lành.
By Anhkiet77 Huynh 2023-05-29 14:44:50 9 9K
Alte
여행
풍경 2
By Hyuntae Park 2023-08-07 13:45:18 4 7K
Gardening
휴일
산과 바다
By Hyuntae Park 2023-07-14 01:10:38 5 8K
Art
이태와이시
귀여운이들 이태,이시 사랑해
By Ljino K1004 2023-07-23 12:31:42 4 8K