Προωθημένο

"Sovelmash" D&E construction site today Asphalt paving, installation of heating mains and other activities

2
12χλμ.

​​📌"Sovelmash" D&E construction site today | Asphalt paving, installation of heating mains and other activities 

 

At the main entrance to the O&A, the ground level has grown considerably from what you may have seen in one of the latest videos. The geotextile was installed and backfilling with sand commenced. This area will be levelled and prepared for asphalt paving, and so will be the area at the rear of the building, near the ramp. 

 

Due to the fact that the level of the heating mains utilities turned out to be higher than expected, it was necessary to dismantle the concrete bedding and dig a bit deeper in order to bypass the utilities. As of today, these tasks have been completed. 

 

Watch the video https://youtu.be/GwBaA-k3exw

for an overview of the work performed at the construction site.

Participate in the project by registering through our link

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Love
Yay
6
Αναζήτηση
Κατηγορίες
Διαβάζω περισσότερα
άλλο
여행
풍경 3
από Hyuntae Park 2023-08-07 13:46:50 3 6χλμ.
Κεντρική Σελίδα
Pi Network
Hãy đưa ra nhận định của bạn cho ngày Open Mainnet 
από Qalab A1985 2023-05-19 13:26:57 2 9χλμ.
άλλο
Pi Network White Paper
As the world becomes increasingly digital, cryptocurrency is a next natural step in the...
από Isaac Wanyama 2022-10-23 14:50:51 20 23χλμ.
άλλο
여행
풍경
από Hyuntae Park 2023-08-17 10:15:28 2 7χλμ.
άλλο
difference between "solargroup" and "sovelmash"
hi dear subscribers, just a little detail, in our publication every day two (2) keywords are...
από Konan Firmin Kouakou 2023-10-21 20:21:31 1 9χλμ.