​​📌"Sovelmash" D&E construction site today | Asphalt paving, installation of heating mains and other activities 

 

At the main entrance to the O&A, the ground level has grown considerably from what you may have seen in one of the latest videos. The geotextile was installed and backfilling with sand commenced. This area will be levelled and prepared for asphalt paving, and so will be the area at the rear of the building, near the ramp. 

 

Due to the fact that the level of the heating mains utilities turned out to be higher than expected, it was necessary to dismantle the concrete bedding and dig a bit deeper in order to bypass the utilities. As of today, these tasks have been completed. 

 

Watch the video https://youtu.be/GwBaA-k3exw

for an overview of the work performed at the construction site.

Participate in the project by registering through our link

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Love
Yay
6
Pesquisar
Categorias
Leia mais
Início
Crypto News
Mount pressure regulation! This Crypto Exchange Says Goodbye to the US    Bittrex Says...
Por Qalab A1985 2023-04-02 01:39:02 4 9KB
Outro
Mùa hạ
Mùa hạ đã đến.
Por Khánh Phạm 21 2023-05-31 19:52:22 2 9KB
Food
奶油富士
奶油富士,脆甜可口
Por Td Ego 2023-10-16 23:06:18 0 8KB
Outro
여행
시원한 여름
Por Hyuntae Park 2023-08-04 09:10:13 2 7KB
Outro
風景
夕陽.水舞
Por Lin5 88589 2023-07-20 12:34:52 2 8KB