"Sovelmash" D&E construction site today Asphalt paving, installation of heating mains and other activities

2
12KB

​​📌"Sovelmash" D&E construction site today | Asphalt paving, installation of heating mains and other activities 

 

At the main entrance to the O&A, the ground level has grown considerably from what you may have seen in one of the latest videos. The geotextile was installed and backfilling with sand commenced. This area will be levelled and prepared for asphalt paving, and so will be the area at the rear of the building, near the ramp. 

 

Due to the fact that the level of the heating mains utilities turned out to be higher than expected, it was necessary to dismantle the concrete bedding and dig a bit deeper in order to bypass the utilities. As of today, these tasks have been completed. 

 

Watch the video https://youtu.be/GwBaA-k3exw

for an overview of the work performed at the construction site.

Participate in the project by registering through our link

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Love
Yay
6
Pesquisar
Categorias
Leia mais
Outro
여행
여름 바다
Por Hyuntae Park 2023-08-27 03:55:16 4 8KB
Art
美图
虎图  
Por 振通 瞿 2023-07-27 02:59:43 2 7KB
Networking
Pi network
Cùng nhau hướng tới ánh sáng và đón nhận những tia nắng ban...
Por Anhkiet77 Huynh 2023-05-18 06:25:24 10 8KB
Networking
Welcome to join the SOLARGROUP team
​​📌Welcome to join the SOLARGROUP team    Interested in working for a dream company?...
Por Konan Firmin Kouakou 2023-07-21 09:27:14 1 7KB
Início
I'm here!
Greatings everyone. Nice to see you here. This is my first time come here. I come from China.
Por 18822 275151 2023-04-23 14:52:06 3 8KB