Progress of BETI

2
8χλμ.

​​📌Earthwork, finishing and other activities | "Sovelmash" D&E construction 

 

Diverse and extensive work is now being carried out at the construction site. 

 

✅ The area behind the building has been levelled and prepared for asphalt paving. 

 

✅ On the left-hand side of the entrance to the building: 

 

— work is underway to install the grounding. A temporary road has been built, and all water supply utilities, storm water drainage and so on have been completed; 

 

— the work of extending the Internet and all low-current networks is still to be carried out; 

 

— the input is being grounded in the area where the deep electrical input to the building is made, these are the four doors behind which the transformers are located. In order to route the wires inside the building, work is being done to prepare the input itself. Once these tasks are completed, the building will have a stable voltage supply; 

 

— all manholes are at level 0 and it will soon be possible to start removing the temporary road slabs to perform final levelling of the site and to make preparations for the future asphalt paving; 

 

  the temporary fence has been dismantled and its removal will continue. 

 

✅ In front of the entrance to the building: 

 

— the site has been levelled and the plate compactor is in operation; 

 

— a truck with heating radiators has been unloaded. 

 

✅ On the right-hand side of the entrance to the building: 

 

— the earthwork is underway: trays have been installed - they have been waterproofed, filled with sand, and you can already observe the pipes being welded together. You can see the sewer manholes, the expansion joints installed, the fully assembled waterproofed chamber through which heat will be supplied. 

 

✅ In the O&A: 

 

— on the 1st floor of the O&A, work continues on the installation of interior glass partitions and frames as well as finishing work in the staircase shafts, both inside and outside; 

 

— heating work has started on the 2nd floor of the office and amenity building; tiling has been done on the 2nd floor mezzanine and the electrical networks are nearing completion (the degree of readiness for the electrical networks is quite high); 

 

— on the third floor of the O&A, the heating distribution and electrification have already been completed. 

 

The final stage of installing the elevators is underway. 

 

Watch the video https://youtu.be/xFybMd6afEE

for more details. 

 

The work currently underway is quite extensive and requires everyone's attention for successful implementation of the project!

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Αναζήτηση
Κατηγορίες
Διαβάζω περισσότερα
Κεντρική Σελίδα
Pi network
Tương tác để phát triển hệ sinh thái vững chắc.
από Anhkiet77 Huynh 2023-05-05 04:51:29 5 8χλμ.
άλλο
유틸
에코시스템으로 유틸점수 올리기  (복사해서 이대로 하세요) 아래 보라색Testnet Ecosystem 누름   처음 접속하면 팝업창 allows 클릭...
από Env News 2023-10-12 02:11:31 7 7χλμ.
άλλο
Crypto News
Hoa Kỳ và El Salvador: những quốc gia quan tâm nhiều nhất đến Bitcoin Theo một...
από Qalab A1985 2023-03-14 00:27:45 6 11χλμ.
Κεντρική Σελίδα
Cuốn sách CHIẾN TRANH TIỀN TỆ NÓI VỀ THẾ GIỚI SẼ RA MẮT 1 ĐỒNG TIỀN vào đầu năm 2024
Chúng ta sẽ chờ đón sự kiện này nhé! Những người khai thác Pi...
από Luon Gnh82 2023-04-18 02:19:24 1 10χλμ.
άλλο
여행
풍경
από Hyuntae Park 2023-09-02 10:36:20 1 6χλμ.