All lines to connect cold water have been installed. "SOVELMASH" D&E construction
📌All lines to connect cold water have been installed | "Sovelmash" D&E construction
The main news for today from the "Sovelmash" construction site in a new video.
https://youtu.be/aUn_lomqL6s
Wells have been installed at the main entrance to the building, the ground has been levelled, the geotextile has been installed, and backfilling with sand has been carried...