All lines to connect cold water have been installed. "SOVELMASH" D&E construction

2
14K

​​📌All lines to connect cold water have been installed | "Sovelmash" D&E construction 

 

The main news for today from the "Sovelmash" construction site in a new video.

https://youtu.be/aUn_lomqL6s

 

 

Wells have been installed at the main entrance to the building, the ground has been levelled, the geotextile has been installed, and backfilling with sand has been carried out. This area will subsequently be covered with crushed stone and ready for asphalt paving. 

 

A chamber has been installed to supply water to the building. Cold water supply is being connected to enable the fire safety system to operate. 

 

The grounding work is nearing completion. To the right of the building, preparations are underway to accept asphalt concrete. 

 

Outside the construction site, the excavation work is being carried out to connect the heating pipeline. 

 

Concrete bedding and waterproofing have been completed, trays are being installed, and pipes are being removed from the territory of "Sovelmash". Very soon the heating line will be looped and hot water will be supplied. 

 

All the lines have been connected to provide cold water supply. 

 

The sanitary and storm water sewer wells are now located quite high above ground level - this entire area will be filled with sand. 

 

The heating line is brought inside the building. All the equipment of the heat distribution station, once welded and piped, will provide the building with heat. 

 

The heat supply line is being installed in the O&A, too. The power supply system is distributed to the premises. 

 

Enjoy watching, subscribe to our social media, stay up to date with all the events that are happening in the life of the project! 

 

Today, everyone can influence the pace of work both inside and outside the building, both documentation and development work, as well as the pace of preparing a production batch of angle grinders by investing. And to get the most out of it, take advantage of the new "Thank You" offer. Learn more about it by following this link.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
4
Site içinde arama yapın
Kategoriler
Read More
Causes
第五城的功能
第五城将有如下功能: 1、发布实时新闻 2、现场直播(app版即将推出) 3、短视频 4、群聊 5、私人聊天 6、发送语音 7、发送视频 8、即时通话(App即将推出)...
By 红杉 尼尔 2023-12-10 01:11:16 3 9K
Other
Không đăng hình được
Thông báo mã bí mật là sao mn
By Suu trau73 2024-05-02 08:46:25 1 11K
Art
520
㊗派友520快乐!
By Juliang Chen 2023-05-20 02:36:08 6 19K
Dance
Pi Network的愿景
Pi Network的愿景    ...
By Fjj Lwzh 2023-04-03 01:29:41 1 14K
Home
Pi network
Ngày mới tốt lành 
By Anhkiet77 Huynh 2023-05-07 04:49:01 9 9K