Gesponsert

All lines to connect cold water have been installed. "SOVELMASH" D&E construction

2
12KB

​​📌All lines to connect cold water have been installed | "Sovelmash" D&E construction 

 

The main news for today from the "Sovelmash" construction site in a new video.

https://youtu.be/aUn_lomqL6s

 

 

Wells have been installed at the main entrance to the building, the ground has been levelled, the geotextile has been installed, and backfilling with sand has been carried out. This area will subsequently be covered with crushed stone and ready for asphalt paving. 

 

A chamber has been installed to supply water to the building. Cold water supply is being connected to enable the fire safety system to operate. 

 

The grounding work is nearing completion. To the right of the building, preparations are underway to accept asphalt concrete. 

 

Outside the construction site, the excavation work is being carried out to connect the heating pipeline. 

 

Concrete bedding and waterproofing have been completed, trays are being installed, and pipes are being removed from the territory of "Sovelmash". Very soon the heating line will be looped and hot water will be supplied. 

 

All the lines have been connected to provide cold water supply. 

 

The sanitary and storm water sewer wells are now located quite high above ground level - this entire area will be filled with sand. 

 

The heating line is brought inside the building. All the equipment of the heat distribution station, once welded and piped, will provide the building with heat. 

 

The heat supply line is being installed in the O&A, too. The power supply system is distributed to the premises. 

 

Enjoy watching, subscribe to our social media, stay up to date with all the events that are happening in the life of the project! 

 

Today, everyone can influence the pace of work both inside and outside the building, both documentation and development work, as well as the pace of preparing a production batch of angle grinders by investing. And to get the most out of it, take advantage of the new "Thank You" offer. Learn more about it by following this link.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
4
Suche
Kategorien
Mehr lesen
Andere
不沮丧当下 不放弃未来
有人说,我们所见识的每一种惊艳,都曾被平凡历练。任何一种圆满,都曾承受千锤万凿的雕琢;任何一种璀璨,都曾经历百转千回的磨砺。...
Von Liu Jingdong 2023-07-22 13:20:07 4 7KB
Startseite
Pi Network
Mỗi sự khởi đầu đều gian nan 
Von Qalab A1985 2023-06-01 13:04:14 3 10KB
Startseite
Cuộc cách mạng tiền tệ
Cuộc cách mạng tiền kĩ thuật số đang đến gần hãy nhanh tay nắm bắt cơ hội nếu...
Von Baol Ien15 2023-05-11 06:16:07 3 9KB
Startseite
管理员精华截图
kyc需求呼声很高很高
Von 奶瓶 大侠 2023-05-13 06:23:12 4 8KB
Art
Đây là ngôi nhà của các pi thủ tương lai
👍⚡💲
Von L0 DM 2023-12-01 05:16:10 5 8KB