​​📌"Sovelmash" D&E construction site today | Installation of heating equipment, control and land survey of external networks and other activities 

 

The installation of heat engineering equipment is currently in progress at the "Sovelmash" D&E construction site. 

 

The engineering work is being carried out both outside and inside the building - the project has moved on to the stage of finishing, commissioning and start-up activities going on with both engineering and process equipment. 

 

This makes it possible to bring the date of putting the facility into operation as close as possible. 

 

The pipes have already been installed in the heating mains, they are being welded, and the leakage control system is being connected. Waterproofing and other tasks have been completed on a number of nodes. 

 

Outside the "Sovelmash" construction site, preparations are underway to install the utilities. 

 

The area has been prepared for asphalt paving: it is now quite flat, and backfilling with sand and crushed stone has been carried out. 

 

To launch this process an advance payment is to be made, so the attention of everyone interested in the success of the project is called for! The pace of all activities depends on the rate at which investments are coming in. 

 

The temporary fence units have been dismantled and are gradually being removed. 

 

A platform has been assembled for the installation of ventilation and air conditioning equipment, which will reduce the vibration load of the entire building. 

 

The pipes are being treated with a special mixture and put in their intended location, the wells are being installed. 

 

A trench is being formed for installing outdoor lighting utilities. 

 

A part of the temporary road has been dismantled for further laying of utilities. 

 

Work on shaping the vertical layout is proceeding fairly quickly. 

 

Also, according to the representative of "Oblstroy" Dmitriy Skorobogatov, today, July 11, the control and land survey of the constructed external water supply lines, namely 110 mm diameter branches from the production enterprise "Sovelmash" to the constructed chamber is being carried out for mapping these branches on the engineering topographic plan of Moscow. 

 

Inside the building, the work is underway to install lighting. 

 

Find out more in today's video.

https://youtu.be/YQMMkQMRsuU

You can also take part in the project by registering via this link

https://reg.solargroup.pro/amx480

 

https://reg.solargroup.pro/amx480/06

 

 

Like
Yay
7
Căutare
Categorii
Citeste mai mult
Causes
欢迎光临第五城!
https://vcity.app?invite=365339 第五城将有如下功能: 1、发布实时新闻 2、现场直播(app版即将推出) 3、短视频 4、群聊 5、私人聊天 6、发送语音...
By 红杉 尼尔 2023-12-10 01:20:10 1 6K
Networking
Discover PitoGo Services at a glance
GM Pioneers! Alright! New Year New Exciting Development!  Discover Pitogo Services at a...
By PiToGo✈ 2024-01-08 05:51:06 12 16K
Health
Ngày mới vui vẻ!
Chúc mọi người ngày mới luôn ngập tràn niềm vui và nhiều năng...
By Truong Nam 2023-10-16 01:30:55 2 6K
Alte
夏季的时光
记录夏季社会实践时光,劳动很美!
By Yh Lin 2023-07-15 01:57:56 3 6K
Networking
Revolutionizing Social Media Monetization: Pitogo Social Offers Fair Compensation for User Engagement
In today's digital age, social media platforms have become an integral part of our daily lives,...
By Pitogo 2024-01-09 04:21:44 38 14K