Asphalt paving and interior finishing of the 'Sovelmash" D&E
Engineering centre construction
In the past week, the construction of the design and engineering technology department progressed on different fronts.
Finishing layers of asphalt were paved, and a permanent fence was installed on the side of the building where the engineering networks were completed.
A wide range of work was carried out inside the...